The wall is no longer suitable due to mold caused by high humidity in the environment;
Avoid production stops or slowdowns;
Challenges
close coordination with the production manager is necessary to organize the renovation works, considering the client's operation on a 6-day per week shift basis;
utilizing a material that does not promote the propagation of mold and rust;
Adopted solution
Protection panel: only 6mm thick, with visible bark in fiberglass with inert fiber cement support. Easily washable panel, resistant to solvents, mold, and biofilm formation.