Renovation of food facility walls

Parete gastronomia industriale-0

before

Parete gastronomia industriale-1

after

Client's request

  • The wall is no longer suitable due to mold caused by high humidity in the environment;
  • Avoid production stops or slowdowns;

Challenges

  • close coordination with the production manager is necessary to organize the renovation works, considering the client's operation on a 6-day per week shift basis;
  • utilizing a material that does not promote the propagation of mold and rust;

Adopted solution

  • Protection panel: only 6mm thick, with visible bark in fiberglass with inert fiber cement support. Easily washable panel, resistant to solvents, mold, and biofilm formation.

The panels used